Erskine House

Summary

Orby Investment Ltd, the developers of the scheme, awarded GRAHAM the contract to construct the eight storey building which will comprise ground floor retail units and approximately 100,000sq ft of high end office accommodation. Erskine House will become a hive of activity from late 2019, with HM Revenue & Customs set to occupy the seven floors of office space for a period of at least 25 years. The offices will accommodate around 1,600 employees.

Hillsborough-headquartered GRAHAM Construction, which was recently named Major Contractor of the Year at the annual UK Building Awards in London, is Northern Ireland’s largest construction company. It delivers building, civil engineering and fit out projects for both public and private sector clients across the UK and Ireland.

Glass

Spec 1
8mm HS 62/34, Toughened, Heat Soak Tested, 20mm Black Warm Edge Spacer (PSI 0.036), 14.28mm Clear Toughened, Heat Soak Tested, PVB Laminate, Argon Gas Filled, Curved, Toggle

Spec 2
8mm HS 62/34, Toughened, Heat Soak Tested, 18mm Black Warm Edge Spacer (PSI 0.036), 10.8mm Clear Heat Strengthened, Acoustic Laminate, Argon Gas Filled, Toggle.

Spec 3
8mm HS 62/34, Toughened, Heat Soak Tested, 18mm Black Warm Edge Spacer (PSI 0.036), 11.5mm Clear Heat Strengthened, Acoustic Laminate, Argon Gas Filled, Digitally Printed Ceramic Design, Toggle.

Spec 4
6mm HS 62/34, Toughened, heat Soak Tested, 18mm Black Warm Edge Spacer (PSI 0.036), 11.5mm Heat Strengthened Laminate (0.76mm Vanceva/0.76mm Acoustic), Argon Gas Filled, Toggle.

Spec 5
8mm Clear Float, Toughened, Heat Soak Tested,18mm Black Warm Edge Spacer (PSI 0.036), 13.5mm Low-e 1.0 Heat Strengthened, Acoustic Laminate, Argon Gas Filled

Spec 6
8mm Clear Float, Toughened, Heat Soak Tested, 20mm Black Warm Edge Spacer (PSI 0.036), 6mm Clear float, Toughened, Heat Soak Tested, Argon Gas Filled, Ceramic (st colour), Curved, Toggle.

Spec 7
6mm Clear float, Toughened, Heat Soak Tested, 20mm Black Warm Edge Spacer (PSI 0.036), 6mm Clear float, Toughened, Heat Soak Tested, Argon Gas Filled, Ceramic (st colour)

Spec 8
8mm Clear Float, Toughened, Heat Soak Tested, 20mm Black Warm Edge Spacer (PSI 0.036), 6mm Clear float, Toughened, Heat Soak Tested, Argon Gas Filled, Ceramic (st colour)

Spec 9
6mm HS 62/34, Toughened, Heat Soak Tested, 18mm Black Warm Edge Spacer (PSI 0.036), 10.8mm Clear Heat Strengthened, Acoustic Laminate, Argon Gas Filled, Toggle

Spec 10
6mm Clear float, Toughened, Heat Soak Tested, 18mm Black Warm Edge Spacer (PSI 0.036), 13.5mm Low-e 1.0 Heat Strengthened Acoustic Laminate, Argon Gas Filled

Spec 11
6mm HS 62/34, Toughened, Heat Soak Tested, 18mm Black Warm Edge Spacer (PSI 0.036), 11.5mm Clear Heat Strengthened, Acoustic Laminate, Argon Gas Filled, Digitally Printed Ceramic Design, Toggle

Spec 12
6mm HS 62/34, Toughened, Heat Soak Tested, 20mm Black Warm Edge Spacer (PSI 0.036), 14.28mm Clear Toughened Heat Soak Tested, PVB Laminate, Argon Gas Filled, Curved, Digitally Printed Ceramic Design

Details

Regional managing director at Graham Construction, Jonathan Hall outlined the pride at winning the sought after contract.

“Winning this contract is a major endorsement of Graham as one of the UK's leading construction companies. Erskine House is an iconic Belfast project and we are delighted to be playing a part in reinvigorating this city centre space.” he said.